1. General installation Guide
16
(6) Pipe work on the indoor unit side
Process photo Work details
Things to obey
(installer)
Items to check (manager)
Pipe work on
the indoor unit
side.
Obtain a slope (1/100) Check the slope.
(7) Vent installation
Process photo Work details
Things to obey
(installer)
Items to check (manager)
Install a vent to
facilitate
smooth
drainage of
water.
Install one unit at the end
of the equipment.
Check vents installation.
(8) Water soaking test
Process photo Work details
Things to obey
(installer)
Items to check (manager)
Pour the water
in the
uppermost area
to test it.
Check the pipe slope.
If there is a problem,
readjust the slope.
Check the slope and test
water leakage.
(9) Connecting the vertical pipe
Process photo Work details
Things to obey
(installer)
Items to check (manager)
If there is no
problem in the
above items,
connect the
vertical pipe.
- Secure bonding works.
- Good heat preservation
works.
Must check the pipe pit’s
inner area before finishing
the wall.